I am pleased to make a submission in respect to the above proposal. This submission has been jointly prepared by An Taisce (www.antaisce.org), Cyclist.ie – The Irish Cycling Advocacy Network (www.cyclist.ie) and Dublin Cycling Campaign (www.dublincycling.ie).

The submission comprises four main sections:

  • Section 1: Overarching Remarks / Standard Points Applying to Many Locations
  • Section 2: Comments on the General Planning of the Scheme
  • Section 3: Detailed Comments on Public Transport Aspects
  • Section 4: Specific points on a map-by-map basic with a particular focus on the perspectives of bicycle users

These are followed in the Appendices by schematic maps by An Taisce of the National Transport Authority’s Draft Integrated Implementation Plan 2013 – 2018 including the Swords BRT.

Download the submission here.